[1]
Supsomboon, S., Chaihanit, C. and Butrat, A. 2024. WORKER SCHEDULING OF BANBURY PROCESS USING GOAL PROGRAMMING: A TIRE MANUFACTURING COMPANY CAES STUDY . International Journal of Industrial Engineering: Theory, Applications and Practice. 31, 2 (Apr. 2024). DOI:https://doi.org/10.23055/ijietap.2024.31.2.9717.