[1]
Shen, L., Zhu, H. and Liu, S. 2025. An Adaptive Multi-Swarm Gray Wolf Optimizer for Flexible Job Shop Scheduling Problem with Assembly/Disassembly, and Lot Streaming. International Journal of Industrial Engineering: Theory, Applications and Practice. 32, 6 (Dec. 2025). DOI:https://doi.org/10.23055/ijietap.2025.32.6.11097.