[1]
Mokhtari Moghadam, A., Wong, K.Y. and Piroozfard, H. 2018. SOLVING A HYBRID JOB-SHOP SCHEDULING PROBLEM WITH SPACE CONSTRAINTS AND REENTRANT PROCESS BY A GENETIC ALGORITHM: A CASE STUDY. International Journal of Industrial Engineering: Theory, Applications and Practice. 24, 5 (Jan. 2018). DOI:https://doi.org/10.23055/ijietap.2017.24.5.2371.