[1]
Abdul Azid, I., Che Ani, M.N., Abdul Hamid, S.A. and Kamarudin, S. 2020. SOLVING PRODUCTION BOTTLENECK THROUGH TIME STUDY ANALYSIS AND QUALITY TOOLS INTEGRATION. International Journal of Industrial Engineering: Theory, Applications and Practice. 27, 1 (Feb. 2020). DOI:https://doi.org/10.23055/ijietap.2020.27.1.2901.