[1]
Muştu, S. and Eren, T. 2018. MAXIMUM COMPLETION TIME UNDER LEARNING EFFECT IN PERMUTATION FLOWSHOP SCHEDULING PROBLEM. International Journal of Industrial Engineering: Theory, Applications and Practice. 25, 2 (Apr. 2018). DOI:https://doi.org/10.23055/ijietap.2018.25.2.3179.