Mokhtari Moghadam, A., Wong, K. Y., & Piroozfard, H. (2018). SOLVING A HYBRID JOB-SHOP SCHEDULING PROBLEM WITH SPACE CONSTRAINTS AND REENTRANT PROCESS BY A GENETIC ALGORITHM: A CASE STUDY. International Journal of Industrial Engineering: Theory, Applications and Practice, 24(5). https://doi.org/10.23055/ijietap.2017.24.5.2371