Supsomboon, S., Chaihanit, C. and Butrat, A. (2024) “WORKER SCHEDULING OF BANBURY PROCESS USING GOAL PROGRAMMING: A TIRE MANUFACTURING COMPANY CAES STUDY ”, International Journal of Industrial Engineering: Theory, Applications and Practice, 31(2). doi: 10.23055/ijietap.2024.31.2.9717.