Fordyce, K., Milne, R. J., Wang, C.-T. and Zisgen, H. (2015) “MODELING AND INTEGRATION OF PLANNING, SCHEDULING, AND EQUIPMENT CONFIGURATION IN SEMICONDUCTOR MANUFACTURING. PART I. REVIEW OF SUCESSES AND OPPORTUNITIES”, International Journal of Industrial Engineering: Theory, Applications and Practice, 22(5). doi: 10.23055/ijietap.2015.22.5.1766.