A RUN SUM S CHART WITH TWO SAMPLING INTERVALS

Authors

  • Alex Jun Xiong Lim Universiti Sains Malaysia
  • Michael Boon Chong Khoo Universiti Sains Malaysia
  • Wai Chung Yeong Sunway University
  • Abdul Haq Quaid-i-Azam University

DOI:

https://doi.org/10.23055/ijietap.2019.26.4.4272

Keywords:

industrial engineering

Abstract

The variable sampling interval run sum (VSI RS) S chart that adopts two different sampling interval lengths on the run sum (RS) S chart is proposed. The Markov chain method is used to compute the optimal parameters that minimize the out-of-control zero state average time to signal (ATS), steady state ATS (SATS), expected ATS (EATS) and expected SATS (ESATS). The results show that the optimal VSI RS S chart outperforms the EWMA S chart in detecting moderate and large shifts while surpassing the RS S and standard S charts in detecting all sizes of shifts, in the process standard deviation. The ability of the VSI RS S chart to detect shifts in the process standard deviation quickly can improve productivity in manufacturing and reduce scrap and rework costs. An illustrative example is provided to facilitate the implementation of the proposed chart.

Author Biographies

Alex Jun Xiong Lim, Universiti Sains Malaysia

Alex Jun Xiong Lim is a PhD student in the School of Mathematical Sciences, Universiti Sains Malaysia.

Michael Boon Chong Khoo, Universiti Sains Malaysia

Michael Boon Chong Khoo is a professor in the School of Mathematical Sciences, Universiti Sains Malaysia. He publishes actively in numerous SCI/SCIE indexed journals. He has also served as a reviewer of numerous manuscripts submitted to SCI/SCIE indexed journals.

Wai Chung Yeong, Sunway University

Wai Chung Yeong is an Associate Professor in the School of Mathematical Sciences, Sunway University. He publishes actively in numerous SCI/SCIE indexed journals. He has also served as a reviewer of numerous manuscripts submitted to SCI/SCIE indexed journals.

Abdul Haq, Quaid-i-Azam University

Abdul Haq is a lecturer in the Department of Statistics,
Quaid-i-Azam University. He publishes actively in numerous SCI/SCIE indexed journals. He has also served as a reviewer of numerous manuscripts submitted to SCI/SCIE indexed journals.

Published

2019-07-31

How to Cite

Lim, A. J. X., Khoo, M. B. C., Yeong, W. C., & Haq, A. (2019). A RUN SUM S CHART WITH TWO SAMPLING INTERVALS. International Journal of Industrial Engineering: Theory, Applications and Practice, 26(4). https://doi.org/10.23055/ijietap.2019.26.4.4272

Issue

Section

Quality, Reliability, Maintenance Engineering

Similar Articles

<< < 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 > >> 

You may also start an advanced similarity search for this article.