[1]
Finke, G.R., Singh, M. and Schönsleben, P. 2012. PRODUCTION LEAD TIME VARIABILITY SIMULATION – INSIGHTS FROM A CASE STUDY. International Journal of Industrial Engineering: Theory, Applications and Practice. 19, 5 (Dec. 2012). DOI:https://doi.org/10.23055/ijietap.2012.19.5.702.