[1]
Goyal, A., Sharma, S. and Gupta, P. 2009. PERFORMANCE ANALYSIS OF A MULTIPLE COMPONENT MANUFACTURING SUBSYSTEM OF A RUBBER TUBE PRODUCTION PLANT UNDER PREEMPTIVE RESUME PRIORITY REPAIR. International Journal of Industrial Engineering: Theory, Applications and Practice. 16, 4 (Aug. 2009). DOI:https://doi.org/10.23055/ijietap.2009.16.4.113.