[1]
Moon, D.H., Sim, J., Ro, W. and Kim, D.O. 2023. DEVELOPMENT OF SIMULATION-BASED SCHEDULER FOR BACK-END STAGES IN SEMICONDUCTOR FOUNDRY. International Journal of Industrial Engineering: Theory, Applications and Practice. 30, 3 (Jun. 2023). DOI:https://doi.org/10.23055/ijietap.2023.30.3.8361.