[1]
Serrano, I., de Castro, R. and Goienetxea, A. 2009. Pacemaker, Bottleneck and Order Decoupling Point in Lean Production Systems. International Journal of Industrial Engineering: Theory, Applications and Practice. 16, 4 (Aug. 2009). DOI:https://doi.org/10.23055/ijietap.2009.16.4.158.