[1]
Hsiau, H.-J. and R.Lin, C.-W. 2010. A GENETIC ALGORITHM APPROACH FOR OPTIMIZING CHEMICAL TOWER CONSTRUCTION PROJECT SCHEDULING WITH DYNAMIC RESOURCES CONSTRAINTS. International Journal of Industrial Engineering: Theory, Applications and Practice. 17, 2 (Jun. 2010). DOI:https://doi.org/10.23055/ijietap.2010.17.2.207.