[1]
Sharifi, M., Shojaie, A., Naserkhaki, S. and Shahriari, M. 2018. A BI-OBJECTIVE REDUNDANCY ALLOCATION PROBLEM WITH TIME-DEPENDENT FAILURE RATES. International Journal of Industrial Engineering: Theory, Applications and Practice. 25, 4 (Oct. 2018). DOI:https://doi.org/10.23055/ijietap.2018.25.4.1722.