[1]
Fordyce, K., Milne, R.J., Wang, C.-T. and Zisgen, H. 2015. MODELING AND INTEGRATION OF PLANNING, SCHEDULING, AND EQUIPMENT CONFIGURATION IN SEMICONDUCTOR MANUFACTURING. PART I. REVIEW OF SUCESSES AND OPPORTUNITIES. International Journal of Industrial Engineering: Theory, Applications and Practice. 22, 5 (Oct. 2015). DOI:https://doi.org/10.23055/ijietap.2015.22.5.1766.