[1]
Basar, A. 2019. A NOVEL METHODOLOGY FOR TIME PLANNING OF RESOURCE-CONSTRAINED SOFTWARE PROJECTS WITH HESITANT FUZZY DURATIONS: A CASE STUDY. International Journal of Industrial Engineering: Theory, Applications and Practice. 26, 4 (Jul. 2019). DOI:https://doi.org/10.23055/ijietap.2019.26.4.3321.