[1]
Nanthavanij, S., Yaoyuenyong, S. and Jeenanunta, C. 2010. Heuristic Approach to Workforce Scheduling with Combined Safety and Productivity Objective. International Journal of Industrial Engineering: Theory, Applications and Practice. 17, 4 (Sep. 2010). DOI:https://doi.org/10.23055/ijietap.2010.17.4.370.