[1]
Yearout, R.D., Krumpe, K., Lane, J., Lee, J., Manns, M.L., McKenzie, C.B., Nelms, L., Stockhausen, M.M. and Turnburke, L.N. 2010. Deriving A Bridge to Transfer Unknown (Probabilistic) Times to Known (Deterministic) Times to Allow Confidence Level Estimates for a Time/Cost Tradeoff: A Critical Analysis of PERT/CPM Procedures. International Journal of Industrial Engineering: Theory, Applications and Practice. 17, 3 (Sep. 2010). DOI:https://doi.org/10.23055/ijietap.2010.17.3.378.