[1]
Bae, Y.M. 2011. INTEGRATED RISK MANAGEMENT PROCESS TO ADRESS THE PROBLEM OF ASSIGNING PILOT MISSIONS TO KOREAN ARMY HELICOPTER UNITS. International Journal of Industrial Engineering: Theory, Applications and Practice. 18, 3 (Jul. 2011). DOI:https://doi.org/10.23055/ijietap.2011.18.3.397.