[1]
Mousavi, S.M. 2021. AN EFFICIENT SIMULATED ANNEALING FOR A HYBRID FLOW SHOP SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES AND TWO OBJECTIVES. International Journal of Industrial Engineering: Theory, Applications and Practice. 28, 2 (Nov. 2021). DOI:https://doi.org/10.23055/ijietap.2021.28.2.3805.