[1]
Choi, S.-H., Won, S.H. and Lee, C. 2022. COMPARISON OF ALTERNATIVE SHIP-TO-YARD VEHICLES WITH THE CONSIDERATION OF THE BATCH PROCESS OF QUAY CRANES. International Journal of Industrial Engineering: Theory, Applications and Practice. 20, 1-2 (Mar. 2022). DOI:https://doi.org/10.23055/ijietap.2013.20.1-2.525.