[1]
Öztürk, H. and Lee, G.M. 2019. A PRODUCTION LOT SIZING MODEL CONSIDERING QUALITY CONTROL, REWORK, AND SHORTAGES. International Journal of Industrial Engineering: Theory, Applications and Practice. 25, 6 (Jan. 2019). DOI:https://doi.org/10.23055/ijietap.2018.25.6.5229.