[1]
Rattanamanee, T., Nanthavanij, S. and Dumrongsiri, A. 2020. HEURISTIC PROCEDURE FOR MULTI-WORKDAY VEHICLE ROUTING PROBLEM WITH PRE-ASSIGNED WORKERS AND MANUAL UNLOADING. International Journal of Industrial Engineering: Theory, Applications and Practice. 27, 3 (Dec. 2020). DOI:https://doi.org/10.23055/ijietap.2020.27.3.6207.