[1]
Sousa, S. and Nunes, E. 2021. FRAMEWORK TO DETERMINE THE QUALITY COST AND RISK OF ALTERNATIVE CONTROL PLANS IN UNCERTAIN CONTEXTS. International Journal of Industrial Engineering: Theory, Applications and Practice. 27, 5 (Apr. 2021). DOI:https://doi.org/10.23055/ijietap.2020.27.5.6281.