[1]
Wang, H., Wang, H., Li, Y. and Wang, F. 2021. PRODUCTION DECISION RESCHEDULING OF PREFABRICATED BUILDING PARTS SUBJECT TO INTERFERENCE FROM THE ARRIVAL OF NEW ORDERS. International Journal of Industrial Engineering: Theory, Applications and Practice. 27, 5 (Apr. 2021). DOI:https://doi.org/10.23055/ijietap.2020.27.5.6547.