Finke, G. R., Singh, M., & Schönsleben, P. (2012). PRODUCTION LEAD TIME VARIABILITY SIMULATION – INSIGHTS FROM A CASE STUDY. International Journal of Industrial Engineering: Theory, Applications and Practice, 19(5). https://doi.org/10.23055/ijietap.2012.19.5.702