Goyal, A., Sharma, S., & Gupta, P. (2009). PERFORMANCE ANALYSIS OF A MULTIPLE COMPONENT MANUFACTURING SUBSYSTEM OF A RUBBER TUBE PRODUCTION PLANT UNDER PREEMPTIVE RESUME PRIORITY REPAIR. International Journal of Industrial Engineering: Theory, Applications and Practice, 16(4). https://doi.org/10.23055/ijietap.2009.16.4.113