Moon, D. H., Sim, J., Ro, W., & Kim, D. O. (2023). DEVELOPMENT OF SIMULATION-BASED SCHEDULER FOR BACK-END STAGES IN SEMICONDUCTOR FOUNDRY. International Journal of Industrial Engineering: Theory, Applications and Practice, 30(3). https://doi.org/10.23055/ijietap.2023.30.3.8361