Serrano, I., de Castro, R., & Goienetxea, A. (2009). Pacemaker, Bottleneck and Order Decoupling Point in Lean Production Systems. International Journal of Industrial Engineering: Theory, Applications and Practice, 16(4). https://doi.org/10.23055/ijietap.2009.16.4.158