Şener Avşar, M. M., & Onut, S. (2022). A MULTI-OBJECTIVE MODEL FOR TIME–COST–QUALITY–RISK TRADE-OFF PROBLEMS IN PROJECT MANAGEMENT. International Journal of Industrial Engineering: Theory, Applications and Practice, 29(6). https://doi.org/10.23055/ijietap.2022.29.6.5785