Wang, H., Wang, H., Li, Y., & Wang, F. (2021). PRODUCTION DECISION RESCHEDULING OF PREFABRICATED BUILDING PARTS SUBJECT TO INTERFERENCE FROM THE ARRIVAL OF NEW ORDERS. International Journal of Industrial Engineering: Theory, Applications and Practice, 27(5). https://doi.org/10.23055/ijietap.2020.27.5.6547