YEAROUT, R. D.; KRUMPE, K.; LANE, J.; LEE, J.; MANNS, M. L.; MCKENZIE, C. B.; NELMS, L.; STOCKHAUSEN, M. M.; TURNBURKE, L. N. Deriving A Bridge to Transfer Unknown (Probabilistic) Times to Known (Deterministic) Times to Allow Confidence Level Estimates for a Time/Cost Tradeoff: A Critical Analysis of PERT/CPM Procedures. International Journal of Industrial Engineering: Theory, Applications and Practice, [S. l.], v. 17, n. 3, 2010. DOI: 10.23055/ijietap.2010.17.3.378. Disponível em: https://ijietap.journals.publicknowledgeproject.org/index.php/ijie/article/view/378. Acesso em: 25 nov. 2024.