BARAFKANDEH, S.; ATIGHEHCHIAN, A.; KIANFAR, K. A TWO-STAGE ROBUST METHOD FOR FLEXIBLE INTEGRATED MASTER SURGICAL SCHEDULING AND CASE-MIX PLANNING. International Journal of Industrial Engineering: Theory, Applications and Practice, [S. l.], v. 29, n. 1, 2022. DOI: 10.23055/ijietap.2022.29.1.6549. Disponível em: https://ijietap.journals.publicknowledgeproject.org/index.php/ijie/article/view/6549. Acesso em: 25 nov. 2024.