Goyal, Atul, S.K Sharma, and Pardeep Gupta. 2009. “PERFORMANCE ANALYSIS OF A MULTIPLE COMPONENT MANUFACTURING SUBSYSTEM OF A RUBBER TUBE PRODUCTION PLANT UNDER PREEMPTIVE RESUME PRIORITY REPAIR”. International Journal of Industrial Engineering: Theory, Applications and Practice 16 (4). https://doi.org/10.23055/ijietap.2009.16.4.113.