Serrano, Ibon, Rodolfo de Castro, and Ainhoa Goienetxea. 2009. “Pacemaker, Bottleneck and Order Decoupling Point in Lean Production Systems”. International Journal of Industrial Engineering: Theory, Applications and Practice 16 (4). https://doi.org/10.23055/ijietap.2009.16.4.158.