Basar, Ayfer. 2019. “A NOVEL METHODOLOGY FOR TIME PLANNING OF RESOURCE-CONSTRAINED SOFTWARE PROJECTS WITH HESITANT FUZZY DURATIONS: A CASE STUDY”. International Journal of Industrial Engineering: Theory, Applications and Practice 26 (4). https://doi.org/10.23055/ijietap.2019.26.4.3321.