Dong, Yongfeng, Yurong Jin, Zhiguang Li, Haipeng Ji, and Jing Liu. 2021. “SCHEDULING OPTIMIZATION OF A WHEEL HUB PRODUCTION LINE BASED ON FLEXIBLE SCHEDULING”. International Journal of Industrial Engineering: Theory, Applications and Practice 27 (5). https://doi.org/10.23055/ijietap.2020.27.5.6133.