Wang, Heping, Hui Wang, Yan Li, and Fuyu Wang. 2021. “PRODUCTION DECISION RESCHEDULING OF PREFABRICATED BUILDING PARTS SUBJECT TO INTERFERENCE FROM THE ARRIVAL OF NEW ORDERS”. International Journal of Industrial Engineering: Theory, Applications and Practice 27 (5). https://doi.org/10.23055/ijietap.2020.27.5.6547.