Moon, D. H., Sim, J., Ro, W. and Kim, D. O. (2023) “DEVELOPMENT OF SIMULATION-BASED SCHEDULER FOR BACK-END STAGES IN SEMICONDUCTOR FOUNDRY”, International Journal of Industrial Engineering: Theory, Applications and Practice, 30(3). doi: 10.23055/ijietap.2023.30.3.8361.