Shen, L., Zhu, H. and Liu, S. (2025) “An Adaptive Multi-Swarm Gray Wolf Optimizer for Flexible Job Shop Scheduling Problem with Assembly/Disassembly, and Lot Streaming”, International Journal of Industrial Engineering: Theory, Applications and Practice, 32(6). doi: 10.23055/ijietap.2025.32.6.11097.