Mota, A., Ávila, P., Afonso, L., Bastos, J. and Putnik, G. (2026) “A Comparative Study of Metaheuristic Algorithms for Scheduling on Unrelated Parallel Machines: Minimizing Weighted Earliness–Tardiness with Non-Zero Release Times and Distinct Due Dates”, International Journal of Industrial Engineering: Theory, Applications and Practice, 33(2). doi: 10.23055/ijietap.2026.33.2.11255.