Fordyce, K., Milne, R. J., Wang, C.-T. and Zisgen, H. (2015) “Modeling and Integration of Planning, Scheduling, and Equipment Configuration in Semiconductor Manufacturing: Part II. Fab Capability Assessment”, International Journal of Industrial Engineering: Theory, Applications and Practice, 22(5). doi: 10.23055/ijietap.2015.22.5.2236.