[1]
R. D. Yearout, “Deriving A Bridge to Transfer Unknown (Probabilistic) Times to Known (Deterministic) Times to Allow Confidence Level Estimates for a Time/Cost Tradeoff: A Critical Analysis of PERT/CPM Procedures”, Int J Ind Eng, vol. 17, no. 3, Sep. 2010.