[1]
H. Öztürk and G. M. Lee, “A PRODUCTION LOT SIZING MODEL CONSIDERING QUALITY CONTROL, REWORK, AND SHORTAGES”, Int J Ind Eng, vol. 25, no. 6, Jan. 2019.