Fordyce, K., R. J. Milne, C.-T. Wang, and H. Zisgen. “Modeling and Integration of Planning, Scheduling, and Equipment Configuration in Semiconductor Manufacturing: Part II. Fab Capability Assessment”. International Journal of Industrial Engineering: Theory, Applications and Practice, vol. 22, no. 5, Oct. 2015, doi:10.23055/ijietap.2015.22.5.2236.