Mokhtari Moghadam, A., K. Y. Wong, and H. Piroozfard. “SOLVING A HYBRID JOB-SHOP SCHEDULING PROBLEM WITH SPACE CONSTRAINTS AND REENTRANT PROCESS BY A GENETIC ALGORITHM: A CASE STUDY”. International Journal of Industrial Engineering: Theory, Applications and Practice, vol. 24, no. 5, Jan. 2018, doi:10.23055/ijietap.2017.24.5.2371.