Öztürk, H., and G. M. Lee. “A PRODUCTION LOT SIZING MODEL CONSIDERING QUALITY CONTROL, REWORK, AND SHORTAGES”. International Journal of Industrial Engineering: Theory, Applications and Practice, vol. 25, no. 6, Jan. 2019, doi:10.23055/ijietap.2018.25.6.5229.