Seyyedi, M. H., A. M. Fakoor Saghih, and Z. Naji Azimi. “A FUZZY MATHEMATICAL MODEL FOR MULTI-OBJECTIVE FLEXIBLE JOB-SHOP SCHEDULING PROBLEM WITH NEW JOB INSERTION AND EARLINESS/TARDINESS PENALTY”. International Journal of Industrial Engineering: Theory, Applications and Practice, vol. 28, no. 3, Nov. 2021, doi:10.23055/ijietap.2021.28.3.7445.