Vatankhah Barenji, Ali, and Majid Hashemipour. “A Multi-Agent-Based Approach to Dynamic Scheduling and Control for a Flexible Assembly Line System”. International Journal of Industrial Engineering: Theory, Applications and Practice 26, no. 3 (July 20, 2019). Accessed November 29, 2024. https://ijietap.journals.publicknowledgeproject.org/index.php/ijie/article/view/1951.